Commissioning Authority (CxA)
Acts on behalf of the owner, conduct and provide documented confirmation that all systems; building systems, components and facilities are performing interactively according to the design intent and owner’s operational needs.
IPMS - CxA ensures the following key points:
- Design Intent Verification
- Construction Observation and Warranty Enforcement
- Equipment Performance Verification
- Equipment/Facility Sustainability &Optimization
- Safety and Risk Management Enhancement
- Operators Training